目錄
Contents
前言
Preface
1 變電檢修基本技能
Chapter 1 Basic transformer maintenance skills 1
1.1 繩索打結
Section 1.1 Rope knot 1
1.1.1 麻繩的用途和種類 The use and type of hemp rope 1
1.1.2 常見繩結舉例 Examples of common knots 3
1.2 高處作業(yè)
Section 1.2 Work at heights 7
1.2.1 高處作業(yè)相關基本概念 Basic concepts related to work at heights 7
1.2.2 高處作業(yè)的分類與分級 Classification and grading of work
at heights 8
1.2.3 高處作業(yè)的注意事項 Points for attention of work at heights 10
1.3 緊急救護
Section 1.3 Emergency rescue 12
1.3.1 緊急救護的基本要求 Basic requirements for emergency rescue 12
1.3.2 緊急救護的通用技能 General skills for first aid 12
1.3.3 骨折緊急救護 Fracture emergency care 17
1.3.4 燒傷緊急救護 Burn first aid 18
1.3.5 動物咬傷緊急救護 Animal bite first aid 18
1.3.6 高處墜落緊急救護 Falling accidents emergency rescue 19
1.3.7 中暑緊急救護 Emergency treatment for heatstroke 20
2 故障檢測技術
Chapter 2 Fault examining technology 22
2.1 氧化鋅避雷器直流1mA 電壓(U1mA)及0.75U1mA 下的泄漏電流測試
Section 2.1 Leakage current test of zinc oxide arrester under DC
1mA Voltage(U1mA) and 0.75U1mA 22
2.1.1 工作任務 Work task 22
2.1.2 引用文件 Referenced files 22
2.1.3 天氣及作業(yè)現(xiàn)場要求 Weather and job site requirements 23
2.1.4 準備工作 Preparatory work 23
2.1.5 作業(yè)程序 Procedures 30
2.1.6 相關知識 Relevant knowledge 39
2.2 SF6 氣體充放、回收和檢漏
Section 2.2 Charge, discharge, recovery and leak detection
of SF6 gas 43
2.2.1 工作任務 Work tasks 43
2.2.2 引用的規(guī)程規(guī)范 Referenced code of practice 43
2.2.3 天氣及作業(yè)現(xiàn)場要求 Weather and job site requirements 44
2.2.4 作業(yè)前準備 Preparation before operation 44
2.2.5 作業(yè)程序 Procedure 46
2.2.6 相關知識 Relevant knowledge 58
2.3 電氣設備紅外熱像測溫
Section 2.3 Infrared thermal image temperature measurement of
electrical equipment 61
2.3.1 工作任務 Work tasks 61
2.3.2 引用文件 Referenced files 62
2.3.3 天氣及作業(yè)現(xiàn)場要求 Weather and job site requirements 62
2.3.4 準備工作 Preparatory work 63
2.3.5 作業(yè)程序 Procedures 65
2.3.6 開展本工作的相關附件 Relevant annexes for
carrying out this work 74
2.3.7 相關知識 Relevant knowledge 80
3 故障處理技術
Chapter 3 Practical fault operation technology 90
3.1 油浸式TA 檢查及缺陷處理
Section 3.1 Oi-l immersed TA inspection and defect treatment 90
3.1.1 工作任務 Work tasks 90
3.1.2 引用文件 Referenced file 90
3.1.3 天氣及作業(yè)現(xiàn)場要求 Weather and job site requirements 90
3.1.4 準備工作 Preparatory work 91
3.1.5 作業(yè)程序 Procedure 95
3.1.6 相關知識 Relevant knowledge 102
3.2 ZN12-40.5 真空斷路器滅弧室更換及調試
Section 3.2 ZN12-40.5 vacuum circuit breaker arcing chamber
replacement and commissioning 119
3.2.1 工作任務 Work tasks 119
3.2.2 引用文件 The reference file 119
3.2.3 天氣及作業(yè)現(xiàn)場要求 Weather and job site requirements 120
3.2.4 準備工作 Preparation 120
3.2.5 作業(yè)程序 Procedure 124
3.2.6 開展本工作的相關附件 Relevant attachments to
carry out the work 133
3.2.7 相關知識 Related knowledge 137